Consultation on the Council's Preliminary Draft Charging Schedule was held from 1 October 2012 to 28 November 2012.
In total, 59 representations were received on the Preliminary Draft Charging Schedule. A Report of Consultation was prepared setting out the representations, the council's response to them and the recommendation on which action has been taken in respect of them.
A copy of the Preliminary Draft Charging Schedule and its associated Report of Consultation can be downloaded below:
Community Infrastructure Levy Preliminary Draft Charging Schedule & Draft Infrastructure List (PDF 478kb)
Infrastructure Assessment Report (PDF 6MB)
Study into the economic viability of charging community infrastructure levy in Caerphilly, Merthyr & Rhondda Cynon Taf County Borough Councils (PDF 8.56MB)
Preliminary Draft Charging Schedule Report of Consultation (PDF 809KB)
The report of consultation was used as a background document for the next stage of the CIL process- The Draft Charging Schedule.
Consultation on the Draft Charging Schedule was held from 20 March 2013 to 1 May 2013.
In total, 36 representations were received on the Draft Charging Schedule. A Report of Consultation summarising the comments received, the Council's response to them and the recommended action was submitted to Council for consideration on 8 October 2013.
A copy of the Draft Charging Schedule Consultation documents and the Report of Consultation can be downloaded below:
Draft Charging Schedule (PDF 3.3mb)
Viability Report (PDF 8.5mb)
Draft Regulation 123 List of Infrastructure (PDF 379kb)
CIL Guidance Leaflet (PDF 867kb)
Guidance Note 1 – Example Calculations of CIL Liability (PDF 371kb)
Guidance Note 2 – Draft Instalment Policy (PDF 376kb)
Guidance Note 3 – Draft Social Housing Relief Policy (PDF 369kb)
Guidance Note 4 – Draft Charitable Relief Policy (PDF 360kb)
Draft Charging Schedule & Draft Infrastructure List Report of Consultation (PDF 208kb)